734999104
hft@gmail.com





منهج الدورة التدريبية

8 المحاضرات
Model 01 Building the Foundation

• Project and project management
• Project scheduling
• Project charter
• Project lifecycle
• Simulation Workshop choose your project
• Simulation Workshop define project lifecycle

Model 02 Stakeholder Communications Management

• Stakeholder requirements analysis
• Communication management plan
• Stakeholder engagement plan
• Stakeholder engagement schedule activities
• Simulation Workshop stakeholder analysis

Model 03 Schedule Planning and Development

• Work breakdown structure (WBS)
• Organizational breakdown structure (OBS)
• Control accounts (CA) and work packages
• Activities and milestones
• Sequence activities
• Precedence Diagramming Method (PDM)
• Simulation Workshop build network diagram
• Estimate activity durations
• Project resource breakdown structure (RBS)
• Simulation Workshop build RBS
• Estimate resources and resource availability
• Resource allocation techniques
• Resource constrained schedule
• Simulation Workshop resource management
• Scheduling techniques
• Critical Path Method CPM
• Simulation Workshop CPM
• Monte Carlo simulation
• Schedule risk-assessment techniques
• Schedule model components
• Adjust schedule model techniques
• Simulation Workshop schedule adjustment
• Schedule baseline

Model 04 Schedule Monitoring and Controlling

• Collect activity status
• Reporting periods
• Progress measurement techniques
• Simulation Workshop progress reporting
• Collect resource information and updates
• Resource utilization and availability
• Schedule analysis and audit
• Schedule metrics
• Cost and schedule reserve analysis
• Schedule forecast
• Simulation Workshop schedule forecast
• Alternative project execution options
• Risk mitigation activities
• Project schedule change control
• Update the schedule model
• Schedule baseline changes

Model 05 Schedule Closeout

• Schedule close-out procedures
• Feedback techniques
• Schedule review techniques
• Schedule issue management
• Final acceptance of the contractual schedule components
• Evaluate final schedule performance against baseline schedule
• Lessons learned and best practices
• Final schedule reports
• Archive schedule files

Model 06 Schedule Alignments and integration

• Integrated master plan (IMP)
• Program plan
• Project statement of work (SOW)
• Contracts, agreements, and bid documents
• Integrate scheduling activities into the overall project management process.

Model 07 Schedule Strategy

• Project scheduling objectives and goals
• Schedule approach
• Scheduling policies and procedures
• Schedule best practices, Industry standards, guidelines, regulations, governing standards
• Schedule management plan
• Project schedule configuration management

Model 08 PMI-SP Exam Preparation

• Exam objectives, registration processes, hints and tricks
• Exam study plan, exam Q/A
• Recommended resources for PMP-SP mock exams

المدرب

image
مركز هيلث للتدريب الصحي المستمر

Administrator

0
التقييم
المراجعات
22
الطلاب
56
الدورات التدريبية

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.

المعلومات المرجعية للمتدربين

0
تصنيف البرنامج التدريبي
0.00%
0.00%
0.00%
0.00%
0.00%

المراجعات

تسجيل الدخول أو frontend.Sign Up كطالب يقوم بمراجعة عملية المراجعة